
Teak decks replaced.
Standing rigging replaced. Spreader end modified.
Full osmotic blister repair completed on the hull. Topsides refinished in Awlgrip. Bilge, keel, and mast grid cleaned and coated.
New Yanmar main engine installed. Steering system repaired. New electronics installed.
Copyright © 2026 Safe Harbor Marinas, LLC | website design by risingT, LLC | Login