Following a collision off Nova Scotia, the Swan 56 Clover came to JBY for extensive structural repairs. To minimize disruption to her cruising schedule, the work was completed within a few summer months, allowing her to continue south to the Caribbean.

Removed portions of the galley to provide interior access
Removed and reinstalled the toe rail and teak planking
Reassembled and refinished the galley and other interior components
Restored all affected areas to their original appearance
Assessed the full extent of the collision damage
Removed exterior toe rail and teak planking to access the damaged area
Completed vacuum-bagged composite repairs
Rebuilt the affected bulkhead and stringer area
Refinished the repaired surfaces to match the original construction