Carpentry Services

Our skilled carpentry team handles projects of all sizes, both interior and exterior, restoring your boat to its original condition—or improving upon it.

With extensive experience in teak decks, we deliver everything from refurbishments to full replacements, combining time-tested craftsmanship with the latest techniques. Each winter, we complete multiple deck projects with precision and care.

From leaking hatches and re-veneering bulkheads to custom joinery, navigation station upgrades, and interior modifications, no detail is too small. When it comes to fine woodwork, JBY is the trusted choice.

Carpentry Projects

Select a boat to learn more about the other services provided or filter by builder

  • All
  • Tartan
  • Baltic
  • Abeking & Rasmussen
  • Nautor Swan

WHIRLAWAY

Tartan 5300

Updated the salon, berth, head, and cabinetry below decks, bringing a modern feel and thoughtful design throughout the interior. Work included upgrades to the owner’s cabin, a redesigned head layout, and new doors. On deck, new hatches were installed.

JULES

Baltic 52

Replaced teak decks, toe rails, custom joinery, and interior modifications.

HOUND

Custom 60

Refurbished decks, new hatches, and extensive custom carpentry

Swan 66

MISSY

Swan 66

Interior joinery completed.

Swan 68

DEFIANCE

Swan 68

Interior carpentry completed.

Swan 76

TIGRIS

Swan 76

Varnish serviced. Interior joinery upgraded.

Swan 59

REVELATION

Swan 59

Interior carpentry completed.

Swan 59

SHADOWFAX

Swan 59

Interior carpentry completed.

Swan 60

BETSY

Swan 60

Teak toerail repaired.

Swan 60

CIAO BELLA

Swan 60

Interior carpentry completed.

Swan 60

INNOVISION

Swan 60

Interior carpentry repaired.

NAI’A

Swan 60

Teak decks refurbished with re-seaming and recaulking. Joinery repaired and upgraded.

Swan 601

CHEROKEE

Swan 601

Carpentry repaired.

Swan 65

ARDEN

Swan 65

Teak decks repaired.

Swan 65

CHUI SIMBA

Swan 65

Interior door frames replaced.

Swan 65

SOIXANTE CINQ

Swan 65

Cabin soles replaced.

Swan 56

WHITE RHINO

Swan 56

Teak decks sanded.

Swan 57 S&S

ABRACADABRA

Swan 57

Aft cockpit modified and refinished in gelcoat. Major interior modifications completed.

Swan 57 S&S

ARISTROCRAT

Swan 57

Teak decks replaced.

Swan 57 S&S

EQUINOCCIO

Swan 57

Teak decks sanded. Extensive interior joinery modifications completed.

Swan 57 S&S

IAORANA

Swan 57

Teak decks replaced.

Swan 57 S&S

INFINITY

Swan 57

Teak decks replaced.

Swan 59

ANDROMEDA

Swan 59

Fixed ports replaced.

Swan 56

AMERIGO

Swan 56

Interior carpentry completed. Interior varnish refinished.

Copyright © 2026 Safe Harbor Marinas, LLC | website design by risingT, LLC | Login